How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Figure 4: Joints of successive packing should be staggered at 90°. When enough rings have been installed so that the nose of the gland will reach them, individual tamping should be supplemented by using the gland.

 

5. After the last ring is installed. Put the gland in place and take up bolts finger tight or very slightly snugged up. Do not jam packing into place with excessive

gland loading. Start the pump and take up bolts until leakage is decreased to a tolerable minimum. Make sure gland bolts are adjusted evenly. Stopping leaking entirely at this point will cause the packing to burn up.

6. Allow packing to leak freely when starting up a newly packed pump. Excessive leakage during the first hour of operation will result in a better packing job over a longer period of time. Take up gland bolts gradually as the packing seats to a tolerable level of 10 to 12 drops per minute per inch of shaft diameter. Never try to stop leakage entirely, unless packing manufacturer indicated that it is safe to do so.

7. When specified by the pump manufacturer, provide means of lubricating the shaft and the packing through the lantern ring by supplying water, oil, grease or liquid handled in the pump. Fittings for this purpose are standard on many pumps.

8. If the stuffing box has a lantern ring , make sure that the lantern ring, as installed, is slightly behind the fluid inlet so that it will move under the inlet as the follower pressure is applied.See Figure 5

 

9. On both centrifugal and reciprocating pumps, about 70% of wear is on the outer two packing rings nearest the gland. However, each additional ring does throttle some fluid pressure. On most equipment, there must be enough rings so if one fails, another does the sealing, and the machine need not be shut down.

Installation of SEPCO's Patented Spiral Pack Packing:

Warning: Never wind bulk or coiled packing into the stuffing box. Cut the packing into separate rings before installation. Use the same procedure of installing rings outlined in Steps 1-9.

Installation of PTFE 8 Graphite Yarn Packing:

Warning: Seat rings gently, the gradually tighten bolts after pump is on stream. Use the same procedure of installing rings outlined in Steps 1-9. >>The End

 

[1]

[2] BACK Total 2 Page 1/2
浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn
主站蜘蛛池模板: 靖西县| 安溪县| 曲水县| 张北县| 奉贤区| 麻阳| 丽水市| 巴南区| 思茅市| 潼关县| 河池市| 汉寿县| 邯郸市| 甘德县| 都匀市| 武隆县| 确山县| 黑河市| 阳春市| 德化县| 镇宁| 盐津县| 中阳县| 郧西县| 内黄县| 邓州市| 瑞安市| 衡东县| 浮山县| 分宜县| 德庆县| 康定县| 师宗县| 颍上县| 云南省| 乌兰察布市| 张家港市| 和平区| 库尔勒市| 汪清县| 隆化县|